A company built around the response of the ore
Zarfaravar’s work began with mineral processing expertise. Differences in mineralogy and ore response mean that a successful route cannot simply be copied from one deposit to another. Laboratory studies have therefore remained central to its development.
Developing gold-extraction know-how
The company’s recorded knowledge-based recognition in 2017 followed its development of gold extraction by cyanidation. This work connects ore characterisation, extraction tests and the conditions needed to apply the process.
A new ore still requires its own assessment. Associated minerals, liberation, solution behaviour and site conditions affect how a technology should be tested and designed.
From testwork to processing plant engineering
As its management and engineering functions developed, Zarfaravar expanded into plant design, construction supervision and EPC services. Flowsheets, mass balances, engineering drawings and equipment selection form part of that work.
The Jelambadan sulphide gold and Navid Farayand copper cathode projects illustrate the link between laboratory studies, circuit selection and plant engineering.
Developing a route for a new material
The starting point is a defined question: which component should be recovered, what must the product meet, and which constraints matter? Available data then informs the test programme and development stages.
The outcome may be a selected processing method, design parameters or the need for additional confirmation. Study, engineering and execution support are defined in the technical proposal for the project.