01 / FEEDFeed preparation
04 / PRODUCTFinal product
02 / SEPARATIONMineral separation
03 / RECOVERYProduct recovery
Engineered for continuous productionLAB → PROCESS → PLANT
Mineral processing engineering

Material intelligence,
process power

We integrate engineering design, specialist laboratory testing and data analysis to reduce risk, improve performance and reach stable production.

Lower risk
testing on real samples
Data-led decisions
assays and mass balance
Stable production
commissioning and optimization
Explore the collaboration path

02 An integrated path

From material insight,
to stable production.

Every stage completes the input for the next — no gaps and no decision detached from plant reality.

01/ 05
Industrial view related to Process Studies & Design
PROCESS / 01From material characterization to technology selection
ZFR / SERVICE / 01

Process Studies & Design

We characterize the ore, measure its response in the laboratory, and design the processing route around test data, mass balance and project economics.

Define this stage for my project

02 An integrated path

From material insight,
to stable production.

Industrial view related to Process Studies & Design
01

From material characterization to technology selection

Process Studies & Design

We characterize the ore, measure its response in the laboratory, and design the processing route around test data, mass balance and project economics.

  • Mineralogical studies
  • Flowsheet and mass balance
  • Pilot testing and feasibility
Industrial view related to Basic & Detailed Engineering
02

Turning the process into buildable documents

Basic & Detailed Engineering

We integrate conceptual, basic and detailed design across equipment, structure, mechanical and electrical disciplines before the plant reaches the jobsite.

  • Layout and 3D model
  • Equipment and structural design
  • Electrical and mechanical documents
Industrial view related to Procurement Engineering
03

The right selection before costly procurement

Procurement Engineering

We manage technical specifications, vendor assessment and bid alignment so equipment matches the real feed, capacity and operating conditions.

  • Datasheets and RFQs
  • Technical vendor evaluation
  • Supply quality control
Industrial view related to Construction & Installation Supervision
04

Quality control where the plant is built

Construction & Installation Supervision

From civil works to mechanical and electrical installation, we monitor compliance with engineering documents, standards and the project schedule.

  • Site and periodic supervision
  • Installation and alignment control
  • Non-conformance management
Industrial view related to Commissioning & Optimization
05

Bringing the plant to its real capacity

Commissioning & Optimization

We continue through cold and hot commissioning, operator training and bottleneck analysis until production is stable, recovery improves and costs decline.

  • Commissioning and training
  • Capacity and efficiency improvement
  • Operations management

03 Selected projects

Data transformed into
real production.

Selected iron, gold, copper and recycling projects that turned a technical challenge into a measurable execution path.

01/ 04
Zarfaravar project image: Akkahour Hematite Concentration
Fin, HormozganCASE / 01
Akkahour Iron Ore Co.

Akkahour Hematite Concentration

Operations management and development of a magnetic-separation hematite concentration plant, created to reduce raw ore sales and produce a higher-grade iron concentrate.

  • Magnetic separation
  • Operations management
Start a similar project
80
t/h feed capacity
50,000
t/y production
01
Project dossier

03 Selected projects

Data transformed into
real production.

Zarfaravar project image: Akkahour Hematite Concentration
01 / Fin, Hormozgan

Akkahour Hematite Concentration

Operations management and development of a magnetic-separation hematite concentration plant, created to reduce raw ore sales and produce a higher-grade iron concentrate.

80
t/h feed capacity
50,000
t/y production
Zarfaravar project image: Jelambadan Sulphide Gold
02 / Joveyn, Razavi Khorasan

Jelambadan Sulphide Gold

A combined flotation and cyanide-leaching process designed after two years of study to recover refractory gold and deliver a higher-value final product.

250
t/day feed capacity
2
years of specialist study
Zarfaravar project image: Parandak Copper Cathode
03 / Zarandieh, Markazi

Parandak Copper Cathode

Mineralogical studies plus crushing, leaching, solvent extraction and electrowinning design for copper cathode production in one integrated industrial chain.

300
t/day feed capacity
700
t/y cathode
Zarfaravar project image: Battery Recycling in Armenia
04 / Armenia

Battery Recycling in Armenia

A spent lead-acid battery recycling chain, from mechanical separation through smelting, refining and waste management with a reduced environmental footprint.

5,000
t/y recycling
3,000
t/y lead production

04 Zarfaravar scientific core

Mineral processing
laboratory capabilities

Testing real samples narrows the gap between engineering assumptions and material behavior — producing a more accurate flowsheet with lower investment risk.

Flotation and pilot testing
LAB / 01Flotation and pilot testing
Industrial-scale test equipment
LAB / 02Industrial-scale test equipment
  1. Sample Preparation

    Crushing, grinding and sample preparation

  2. Characterization

    Sizing, work index and mineralogy

  3. Gravity Separation

    Shaking table, jig and gravity tests

  4. Flotation

    Laboratory and semi-industrial pilot tests

  5. Leaching

    Column, agitation, acid and cyanide tests

  6. Magnetic Separation

    High and low intensity, dry and wet

  7. Pyrometallurgy

    Thermal tests in box and tube furnaces

  8. Dewatering

    Filtration and product behavior assessment

Confidence in every decision
01

Documented methodRecorded test conditions and parameters

02

Scalable resultsFrom testwork to pilot and plant

03

Analytical reportOutputs engineered for process design

05 Start a technical conversation

Your challenge is
where we begin.

Share a few initial details about the material, capacity or production challenge. We route your request to the right process, operations or laboratory specialist.

01

Register the needInitial project information

02

Technical reviewBy the relevant specialist

03

Consultation sessionA defined action path

Direct contact with the head office021 4401 6013[email protected]
Request type

06 Quick answers

Your question is
probably answered here.

Frequently asked questions are organized around the stage your project is currently in.

01What information is needed to start designing a processing plant?

The mineral type, initial assay results, target capacity, project location, and water and energy constraints are the starting point. If data is incomplete, a sampling and laboratory test program is defined.

02Are your design services limited to process engineering?

No. The scope can integrate conceptual, basic and detailed design for process, equipment, structures, mechanical systems, electrical systems, instrumentation and layout.

03What does a feasibility study deliver?

The deliverables include a proposed flowsheet, mass balance, major equipment selection, water and energy estimates, an investment range and the project technical risks.

07ZFR / TECHNICAL INSIGHTS

Engineering knowledge,
ready for the field.

Seven in-depth guides based on laboratory studies, process design and operating-plant experience.

View all articles