Process Studies & Design
We characterize the ore, measure its response in the laboratory, and design the processing route around test data, mass balance and project economics.
Define this stage for my projectWe integrate engineering design, specialist laboratory testing and data analysis to reduce risk, improve performance and reach stable production.
02 An integrated path
Every stage completes the input for the next — no gaps and no decision detached from plant reality.

We characterize the ore, measure its response in the laboratory, and design the processing route around test data, mass balance and project economics.
Define this stage for my project02 An integrated path

From material characterization to technology selection
We characterize the ore, measure its response in the laboratory, and design the processing route around test data, mass balance and project economics.

Turning the process into buildable documents
We integrate conceptual, basic and detailed design across equipment, structure, mechanical and electrical disciplines before the plant reaches the jobsite.

The right selection before costly procurement
We manage technical specifications, vendor assessment and bid alignment so equipment matches the real feed, capacity and operating conditions.

Quality control where the plant is built
From civil works to mechanical and electrical installation, we monitor compliance with engineering documents, standards and the project schedule.

Bringing the plant to its real capacity
We continue through cold and hot commissioning, operator training and bottleneck analysis until production is stable, recovery improves and costs decline.
03 Selected projects
Selected iron, gold, copper and recycling projects that turned a technical challenge into a measurable execution path.

Operations management and development of a magnetic-separation hematite concentration plant, created to reduce raw ore sales and produce a higher-grade iron concentrate.
03 Selected projects

Operations management and development of a magnetic-separation hematite concentration plant, created to reduce raw ore sales and produce a higher-grade iron concentrate.

A combined flotation and cyanide-leaching process designed after two years of study to recover refractory gold and deliver a higher-value final product.

Mineralogical studies plus crushing, leaching, solvent extraction and electrowinning design for copper cathode production in one integrated industrial chain.

A spent lead-acid battery recycling chain, from mechanical separation through smelting, refining and waste management with a reduced environmental footprint.
04 Zarfaravar scientific core
Testing real samples narrows the gap between engineering assumptions and material behavior — producing a more accurate flowsheet with lower investment risk.


Crushing, grinding and sample preparation
Sizing, work index and mineralogy
Shaking table, jig and gravity tests
Laboratory and semi-industrial pilot tests
Column, agitation, acid and cyanide tests
High and low intensity, dry and wet
Thermal tests in box and tube furnaces
Filtration and product behavior assessment
Documented methodRecorded test conditions and parameters
Scalable resultsFrom testwork to pilot and plant
Analytical reportOutputs engineered for process design
05 Start a technical conversation
Share a few initial details about the material, capacity or production challenge. We route your request to the right process, operations or laboratory specialist.
Register the needInitial project information
Technical reviewBy the relevant specialist
Consultation sessionA defined action path
06 Quick answers
Frequently asked questions are organized around the stage your project is currently in.
The mineral type, initial assay results, target capacity, project location, and water and energy constraints are the starting point. If data is incomplete, a sampling and laboratory test program is defined.
No. The scope can integrate conceptual, basic and detailed design for process, equipment, structures, mechanical systems, electrical systems, instrumentation and layout.
The deliverables include a proposed flowsheet, mass balance, major equipment selection, water and energy estimates, an investment range and the project technical risks.
07ZFR / TECHNICAL INSIGHTS
Seven in-depth guides based on laboratory studies, process design and operating-plant experience.
CommissioningCommissioning is not a final construction event. It starts in engineering and moves the plant through controlled stages to repeatable production.
Read the full article
Magnetic separationHematite is more weakly magnetic than magnetite, making liberation, field gradient and washing conditions central to performance.
Read the full article
Gold processingGold may be locked within sulphide grains, so a single direct-leach test is not enough to select the process route.
Read the full article
Copper hydrometallurgySX/EW is a closed solution chain: leach chemistry and phase separation determine the electrolyte that ultimately controls cathode quality.
Read the full article