Process Studies & Design
We characterize the ore, measure its response in the laboratory, and design the processing route around test data, mass balance and project economics.
Define this stage for my projectZarfaravar supports mineral projects through laboratory studies, process and equipment design, procurement, site supervision and commissioning.
The scope follows each project’s needs: sample studies, design, equipment procurement and technical support on site.

We characterize the ore, measure its response in the laboratory, and design the processing route around test data, mass balance and project economics.
Define this stage for my project
Testwork and process selection
We characterize the ore, measure its response in the laboratory, and design the processing route around test data, mass balance and project economics.

Engineering documents and construction drawings
We integrate conceptual, basic and detailed design across equipment, structure, mechanical and electrical disciplines before the plant reaches the jobsite.

Technical evaluation and equipment selection
We manage technical specifications, vendor assessment and bid alignment so equipment matches the real feed, capacity and operating conditions.

Construction and installation quality control
From civil works to mechanical and electrical installation, we monitor compliance with engineering documents, standards and the project schedule.

Commissioning and operations support
We continue through cold and hot commissioning, operator training and bottleneck analysis until production is stable, recovery improves and costs decline.
Four projects from our work in copper, tin, gold and iron processing. Each case describes the client’s project and Zarfaravar’s engineering scope.

Mineralogical and processing studies, design, consultancy and construction for the Navid Farayand Alborz copper cathode plant in Parandak.

Mineralogical and processing studies, design, consultancy and construction for the Navid Farayand Alborz copper cathode plant in Parandak.

Studies, design and construction of the Deh Hossein tin and copper concentration plant for Mafragh Mes Sarband, using gravity separation and flotation.

Studies, design and construction of the Jelambadan sulphide gold flotation plant for Radin Zarkan Joveyn in Razavi Khorasan.

Process design and construction of the Radix hematite concentration expansion for Akkahour Iron Ore at Fin, Hormozgan, using magnetic separation.
Testing real samples narrows the gap between engineering assumptions and material behavior — producing a more accurate flowsheet with lower investment risk.


Crushing, grinding and sample preparation
Sizing, work index and mineralogy
Shaking table, jig and gravity tests
Laboratory and semi-industrial pilot tests
Column, agitation, acid and cyanide tests
High and low intensity, dry and wet
Thermal tests in box and tube furnaces
Filtration and product behavior assessment
Documented methodRecorded test conditions and parameters
Scalable resultsFrom testwork to pilot and plant
Analytical reportOutputs engineered for process design
Share a few initial details about the material, capacity or production challenge. We route your request to the right process, operations or laboratory specialist.
Register the needInitial project information
Technical reviewBy the relevant specialist
Consultation sessionA defined action path
Frequently asked questions are organized around the stage your project is currently in.
The mineral type, initial assay results, target capacity, project location, and water and energy constraints are the starting point. If data is incomplete, a sampling and laboratory test program is defined.
No. The scope can integrate conceptual, basic and detailed design for process, equipment, structures, mechanical systems, electrical systems, instrumentation and layout.
The deliverables include a proposed flowsheet, mass balance, major equipment selection, water and energy estimates, an investment range and the project technical risks.
Technical notes on processing methods, laboratory testwork and plant operations.
CommissioningCommissioning is not a final construction event. It starts in engineering and moves the plant through controlled stages to repeatable production.
Read the full article
Magnetic separationHematite is more weakly magnetic than magnetite, making liberation, field gradient and washing conditions central to performance.
Read the full article
Gold processingGold may be locked within sulphide grains, so a single direct-leach test is not enough to select the process route.
Read the full article
Copper hydrometallurgySX/EW is a closed solution chain: leach chemistry and phase separation determine the electrolyte that ultimately controls cathode quality.
Read the full article