Two metals in one study programme
The Deh Hossein plant was designed and built to produce tin and copper concentrates for Mafragh Mes Sarband. The presence of two metals makes separation sequence and the relationship between products central to process selection.
Two years of mineralogical and processing studies preceded the industrial circuit proposal. Gravity separation and flotation were then proposed for processing the tin and copper.
Commissioning the gravity phase
The first plant phase uses industrial shaking tables for gravity separation and entered operation in Shahrivar 1402 in the Iranian calendar. This marks a defined stage of circuit delivery, with the documented commissioning milestone specific to that phase.
From feed preparation to concentrate
The facilities presented include crushing, feed intake, gravity separation, flotation and dewatering equipment. Listed feed capacity is 80,000 tonnes per year, with an 18-month project duration. Zarfaravar’s role spans ore studies, design and plant construction.