Jelambadan Sulphide Gold Flotation

The Jelambadan project began with mineralogical and ore-processing studies in Zarfaravar’s laboratory. Flotation and leaching routes were proposed, with the first-phase flotation line entering operation in Ordibehesht 1402.

Jelambadan Sulphide Gold Flotation
Jelambadan Sulphide Gold Flotation
Client / facility
Radin Zarkan Joveyn Co.
Location
Joveyn, Razavi Khorasan
Scope
Studies, design and construction
Feed capacity
80,000 t/y
Studies in project catalogue
1 year
Listed project duration
18 months
Flotation-phase commissioning
Ordibehesht 1402
01

Understanding the sulphide gold ore

The Jelambadan project was defined for Radin Zarkan Joveyn in Razavi Khorasan. Mineralogical and processing studies took place in Zarfaravar’s laboratory to select a route suited to the ore.

The project description lists a year of studies. Flotation and leaching lines were proposed following that investigation.

02

Flotation and gold concentrate

The first phase comprises the flotation line and entered operation in Ordibehesht 1402 in the Iranian calendar. Its product is gold concentrate. For sulphide-ore processing, flotation concentrates the valuable fraction before subsequent recovery stages.

03

Plant scale and delivery scope

Listed feed capacity is 80,000 tonnes per year, with an 18-month project duration. The plant documentation identifies crushing and flotation sections. Zarfaravar’s role includes ore studies, design and construction; the recorded commissioning milestone relates to the first-phase flotation line.

FAQ / Project record

Frequently asked questions

Which Jelambadan section entered operation in Ordibehesht 1402?

The first-phase sulphide-gold flotation line.

What does the Jelambadan flotation line produce?

Its stated product is gold concentrate.

Discuss your project with our engineers

Tell us the material, project location and the work you need so that a suitable scope can be discussed.

Discuss your project