Ore studies before plant engineering
The Navid Farayand Alborz engagement began with six months of mineralogical and processing studies in Zarfaravar’s laboratory. Crushing and leaching design then followed the findings of this feed investigation.
The scope covers design, consultancy and construction of the copper cathode plant. This continuity connects laboratory findings with engineering decisions and delivery of the processing facilities.
From copper leaching to cathode
The plant route comprises leaching, solvent extraction and electrowinning, or SX-EW. Copper enters solution and is subsequently separated and recovered as cathode. Construction is recorded as starting on 3 Mehr 1400 in the Iranian calendar, with a listed project duration of 18 months.
Tank and heap sections
The project description lists tank feed of 120,000 tonnes per year, heap feed of 200,000 tonnes per year and cathode capacity of 2,000 tonnes per year. Heap-leach design and consultancy form a separate engagement at the same site. Zarfaravar’s company record also includes optimization of the tank-leach, heap-leach and SX-EW sections at Navid Farayand.