The Sarakouh engagement concerns an existing plant. Zarfaravar’s role covered redesign and commissioning of a heap-leaching copper cathode operation for Zarin Mehr Bardsir.

Sarakouh Copper Plant Redesign
Sarakouh Copper Plant Redesign
Client / facility
Zarin Mehr Bardsir Co.
Location
Jowzam, Kerman
Scope
Redesign, modification and commissioning
Heap feed in project catalogue
120,000 t/y
Cathode capacity in project catalogue
500 t/y
Listed project duration
6 months
01

Redesigning an existing plant

The Sarakouh copper cathode plant is located at Jowzam, Kerman, and its client is Zarin Mehr Bardsir. The engagement addressed redesign, modification and commissioning of existing copper-production facilities.

Working within an existing site requires process changes to fit installed equipment and infrastructure. Zarfaravar’s scope at Sarakouh extends from engineering modifications through plant commissioning.

02

A copper heap-leaching route

Sarakouh uses heap leaching. Copper enters solution during ore leaching, while copper cathode is the stated final plant product. The connection between the heap and downstream recovery establishes the context for considering the circuit as an integrated process.

03

Project capacity and duration

The project description lists heap feed of 120,000 tonnes per year, cathode capacity of 500 tonnes per year and a six-month engagement. These specifications describe the scale of the Sarakouh redesign and commissioning scope.

FAQ / Project record

Frequently asked questions

What was Zarfaravar’s scope at Sarakouh?

Redesign, modification and commissioning of Zarin Mehr Bardsir’s heap-leach copper cathode plant.

What project duration is listed?

The project catalogue lists a duration of six months.