Tuzlar Gold Leaching Expansion

The Tuzlar leaching expansion was defined to develop processing capacity and improve the existing plant’s performance. The project documents identify grinding, leaching and loaded-carbon washing facilities.

Tuzlar Gold Leaching Expansion
Tuzlar Gold Leaching Expansion
Client / facility
Tuzlar Gold Plant
Location
Mahneshan, Zanjan
Scope
Leaching line expansion
Listed line feed
60,000 t/y
01

Expanding an existing plant

The Tuzlar leaching expansion at Mahneshan, Zanjan was defined to increase processing capacity, improve gold recovery and optimize operations. The engagement focuses on existing infrastructure and equipment performance.

Its scope concerns the leaching line and is separate from the Tuzlar sulphide-gold flotation plant project. Each section is considered through its role in the complex’s processing chain.

02

Grinding, leaching and loaded carbon

The expansion documentation identifies grinding, leaching and loaded-carbon washing units. These stages connect feed preparation with the subsequent gold-recovery process at Tuzlar.

03

Expansion feed capacity

Listed feed for the leaching expansion is 60,000 tonnes per year. The development targets equipment performance and productivity within existing facilities, with stable production and improved recovery stated as project objectives.

FAQ / Project record

Frequently asked questions

Are the Tuzlar leaching and flotation cases one project?

The project catalogue numbers the leaching expansion and flotation plant separately, with different scopes.

Which facilities are identified in the expansion photographs?

The grinding unit, leaching unit and loaded-carbon washing unit.